Leumi Max

contractor

Tidhar

architect

D.S. Blay Architecture and Design

Location

Bnei Brak

Date of establishment

June 8, 2020

Mega Flash in the Sky of Acoustics
The ceiling that is closer to art that reminds us that there is no need to raise our voice to be right, and that contains things that it does not reveal to the eye or to the mind.
A new chapter in the biography of the LOOP ceiling connected to acoustic ceiling tiles with magnets and embedded in Punteo – J 085 Led recessed Downlight. Made by DURLUM, imported and marketed exclusively by Hecht-Efraim.
The acoustic metal ceiling provides an acoustic and elegant solution that gives a continuous appearance without joints
Photography – Uzi Porat

Share

We take care of all stages of your project.

Related articles

Behind the scenes of the design of the RENUAR flagship branch: a special interview with designer Shmulik Bilgorai Background on the interviewee and his team

Behind the scenes of the design of the RENUAR flagship branch: a special interview with designer Shmulik Bilgorai Background on the interviewee and his team

Wix’s New Campus: A Small City in Its Own Right The Wix campus in Glilot is no longer an office, but a small city spanning

אנו דואגים לכל השלבים של הפרויקט שלכם

דברו איתנו ונתחיל תהליך

We take care of all stages of your project.

Talk to us and we'll start the process.